19. DILATION GROUTING PIPE
Install with the screws on the lids. (with ventilation holes in universal system)
|
|
9. INSULATION MATERIAL FROM ROCKWOOL
Has to be cutted with exact dimension and breached side has to come inside.
|
18. LID
Install with plaster on the last of base Stone
|
8. STANDART BASE STONE
Base Stone which to be manufactured from Bims has to be installed with plaster.
|
17. CERAMIC CHIMNEY PIPE
Adjust lenght and install it with cement which is durable against acids.
|
7. CERAMIC PIPI WHICH HAS CLEANING DISTANCE, CONDENSATION LIQUID BLOCKAGE AND CLEANING LID
|
16. INSULATION MATERIAL FROM ROCKWOOL
Has to be cutted with exact dimension and breached side has to come inside.
|
Ceramic pipe which has cleaning distance has to be installed with plaster which is durable against acid on chimney base (Condensation liquid blockage). Condensation liquid blockage is just to be foreseen for Hart Universal System. Cleaning lid has to fixed on base Stone.
|
15. STANDART BASE STONE
Base Stone which to be manufactured from Pumice (Bims) has to be fix with plaster. Meanwhile plaster has not to go to the back ventilation canal.
|
6. INSULATION MATERIAL FROM ROCKWOOL FOR CLEANING DISTANCE
Has to be cutted with exact dimension of cleaning pipe.
|
14. PLAIN CERAMIC CHIMNEY PIPE WITH 33 cm. LENGHT
Has to be install with cement which is durable against acids.
|
5. BASE STONE WHICH HAS CLEANING DISTANCE
Distance has to be cutted in accordance with height of base Stone which to be manufactured from raw material of Bims.
|
13.INSULATİON MATERIAL FROM ROCKWOOL
Has to be cutted with exact dimension and breached side has to come inside.
|
4. INSULATION MATERIAL FROM ROCKWOOL
Has to be cutted with exact dimension and breached side has to come inside.
|
12. SMOKE PIPE CONNECTION WITH FRONT PLATE
Front plate covers the space which is in the base Stone as around the fire pipe connection.
|
3. BASE STONE WITH VENTILATION GRIDS
Distance of base Stone has to be measured in accordance with ventilation grid. Ventilation grid is just to be foreseen for Hart Universal System.
|
11. INSULATİON MATERİAL OF ROCKWOOL FOR SMOKE PIPE CONNECTION
Has to be cutted in accordance with dimension of smoke pipe connection
|
2. CONDENSATION LIQUID DRAINAGE
Condensation liquid drainage is to be installed to the chimney bas which covered with concrete. Condensation liquid drainage is just to be foreseen for Hart Universal system.
|
10. BREACHED BASE STONE FOR SMOKE PIPE CONNECTION
Has to be cutted breached in accordance with height of base Stone which to be manufactured from raw materials of pumice (Bims)
|
1. CHIMNEY BASE STONE
First chimney base Stone which to be manufactured from Bims has to be installed with plaster and to be covered with the concrete completely.
|